Primavera P6 Ver 18 Overview Course and Tutorial

smack 18 Aug 2019 18:22 LEARNING » e-learning - Tutorial

Primavera P6 Ver 18 Overview Course and Tutorial
$19.99 | Created by ALI Elhendawi| Last updated 6/2019
Duration: 1 h | Video: h264, 1280x720 | Audio: AAC, 44 KHz, 2 Ch | 692 MB
Genre: eLearning | Language: English + Sub | 9 lectures


What you'll learn

Learn Primavera P6 Ver 18.8 Overview Course and Tutorial-Practical Training in a live software with a Technical Support

All levels

Requirements

NO

Description

Learn Primavera P6 Ver 18.8 Overview Course and Tutorial
\n
1. Lecture 1 link:
\n
lecture 1 explain P6 History, P6 Features, P6 Tools, P6 Interface, Critical Path, and CPM technique and terms
\n
2. Lecture 2 Link:
How to download and Install Primavera P6 Ver,18
\n
How to download and install Primavera P6 Ver 18 and Database Configuration on your laptop and be an expert in Primavera
• In this Lecture:
• Installation Guideline step by step with a screenshot
• Database Configuration
3. Lecture 3
Create Project and WBS Details
\n
4. Lecture 4 in Oracle Primavera Ver 18.8 -Activities:
\n
Adding activities and Creating Links
\n
5. Lecture 5 in Oracle Primavera Ver 18.8 -Resources:
Definition of resources, types and details of the resources addition - Measurement units - Prices - Resources codes - How to classify resources to its workers, tools and equipment on the Primavera software last version Ver18.8
How to create Cost accounts for activities and also resources -Adding units to resources -assigning resources and unites and calculate Costs from Units
6. Lecture 6 in Oracle Primavera Ver 18.8 -Create Baselines
\n
Create Baseline the Baseline or Target Schedule provides a point of reference on which to measure and control the underway project. Create a Baseline copy of the schedule before the first update. This will be the target against which the project's cost, schedule, and performance are tracked. Assign each baseline a category to define its purpose (i.e. initial planning baseline, what-if project plan baseline, mid-project status baseline, monthly update comparison baseline). Categories are created under the Admin menu, Admin Categories, Baseline Types.
\n
7. Lecture 7 in Oracle Primavera Ver 18.8- Progress Update
Update the schedule regularly and compare it to the baseline to ensure that resources are being used effectively, project costs are being monitored against the original budget, that there is a knowledge of actual duration and costs in order to initiate contingency plans if  necessary.
Ask the following questions when updating:
· What information needs to be collected to update the project and what method(s) will be used to collect information?
· Who will gather the necessary information used for the project update?
· How often should the project be updated?
· Are resources local or offsite?
· Who will need to see the results of the update and when are these results needed?
· What types of information will be generated after each update in order to communicate progress before the next update period?
\n

Who this course is for:

Beginner and professional Engineer
[i][/i]Screenshots

Primavera P6 Ver 18 Overview Course and Tutorial


Buy Premium Account for Download With Full Speed:

rapidgator_net:
https://rapidgator.net/file/0e22737eaa98daa4af2f2aa1c645b402

uploadgig_com:
https://uploadgig.com/file/download/dD5ab6C871183599/.PrimeraP6Ver18OverviewCourseand.rar


Links are Interchangeable - No Password - Single Extraction

High Speed Download

Add Comment

  • People and smileys emojis
    Animals and nature emojis
    Food and drinks emojis
    Activities emojis
    Travelling and places emojis
    Objects emojis
    Symbols emojis
    Flags emojis